Submission readiness

Is your bid ready to submit—or just written?

Before upload, check one mandatory requirement against the current instructions, its answer and the supporting evidence. Then check the final file set for missing items and unresolved issues. Repeat for the remaining requirements; portal review and submission stay with your team.

Authentic interfaceLocal-first Windows workspaceSix production languagesOne-time licence
In one minute

Ready to submit means the same bid passed every check.

Ask the person approving submission to name the files they are approving. Can they see the current requirement, the evidence behind the answer and any unresolved issue? If a file changes after review, check the affected content again before upload.

Readiness model

Five conditions make “ready” meaningful.

01

Coverage

Ready whenCurrent buyer requirements are represented clearly enough to test coverage and change.
02

Evidence

Ready whenMaterial claims point to approved, applicable proof rather than memory or unrelated files.
03

Blockers

Ready whenEvery unresolved gap is named, owned and tied to one next action.
04

Exact candidate

Ready whenThe file set about to leave the team is the file set that was actually checked.
05

Human portal review

Ready whenBuyer-portal validation and the final submission decision remain deliberate human steps.
Decision states

Use states that say what happens next.

HOLDDo not release

A material condition is unresolved and has a named next action.

REVIEWDecision needed

The team has enough information to review, but not enough to clear.

CLEARProceed to human release

The current candidate has passed the defined control checks.

Release conditions

Ready means the release conditions are satisfied.

Use these checks with the buyer’s instructions and your own approval policy. They are team controls, not claims that REQVERA automates every step.

01

Authority and coverage

Proposal ownerConfirm the current buyer pack and amendments. Reconcile mandatory requirements, response locations and outstanding clarifications; a missing mandatory item remains a blocker.
02

Proof and approvals

Evidence and decision ownersCheck claim wording against current applicable evidence. Resolve conflicting or expired proof. Record the person authorised to approve exceptions and the version their decision covers.
03

Commercial offer and signatures

Authorised commercial reviewerReconcile the pricing workbook, totals, assumptions, validity period and contractual qualifications with approved terms. Confirm required signatures and signing authority; do not treat a complete narrative as commercial approval.
04

Forms and attachments

Package ownerVerify every required form, attachment, filename, file type, size limit and packaging instruction. Open the exported files to confirm legibility, populated fields and the approved versions.
05

Deadline and portal

Authorised submitterConfirm the deadline and timezone from the current buyer source, required portal access and any upload or validation steps. Leave time for failed uploads and corrections. A local readiness decision does not mean the portal has accepted the bid.
06

Exact candidate and receipt

Release ownerIdentify the final file set, preserve the approval record and recheck affected controls after any material change. After human submission, retain the buyer confirmation and reconcile it with the uploaded candidate.
Decision example

One unsupported claim. One clear next action.

A synthetic bid promises a 40% reduction in missed appointments. The evidence supports 18% for one clinic—not the submitted claim. Follow the correction before the package goes to the buyer.

Current buyer instruction B-017 v2 requires a documented result and its limits. Check the wording against the current instruction, not a reused answer. B-017 v2 remains the review baseline.

Claim and supporting proof Candidate A states 40%; E-017 v1 records 18% in one clinic. The evidence owner narrows the claim to the recorded result and scope. Candidate B states 18%, the clinic, the period and the limits.

Approval after correction Candidate A stays on HOLD; changing a sentence is not a new clearance. The authorised reviewer checks the revised claim and its evidence again. Record the decision for Candidate B; keep HOLD if a critical condition remains.

The files that will leave A new export can differ from the version reviewed. Match the final file inventory to the reviewed version before sign-off. CLEAR is conditional on all defined checks passing; portal review and submission remain human steps.

Illustrated team-control example, not a customer result or an executed REQVERA import test. The figures and documents are synthetic. Approval must be observed and recorded; this example does not prove product clearance or buyer acceptance.

Use the seven-stage release checklist to record the evidence behind each decision. If buyer authority changes, follow the amendment impact chain before carrying an earlier approval forward.

Release boundary

“Draft complete” is an input to readiness, not the readiness decision.

Completing the writing work does not automatically validate the evidence, amendment state or final file set.

NextUse the release checklist to walk the seven control questions in order.
Explore by need

Keep the next control question clear.

The resource hub is organised by buyer task, not by page type. Move sideways only when the question changes.