Is your bid ready to submit—or just written?

Check each mandatory requirement against the current buyer instructions, your answer and its supporting evidence. Review the final files for missing items and unresolved issues. Your team retains responsibility for portal review and submission.

Authentic interfaceLocal-first Windows workspaceSix interface languagesOne-time licence
In one minute

Ready to submit means the same bid passed every check.

Identify the exact files being approved for submission. For each requirement, trace the answer to current supporting evidence and record any unresolved issue. Recheck the affected content if a file changes after review.

Readiness model

Five conditions make “ready” meaningful.

01

Coverage

Ready whenEach current buyer requirement can be traced to its answer, including any amendments.
02

Evidence

Ready whenEach significant claim is linked to approved evidence that applies to this bid.
03

Blockers

Ready whenBlocking gaps are resolved. Every remaining open item has an identified owner and a next action.
04

Exact candidate

Ready whenThe files selected for submission are the exact versions that were reviewed.
05

Human portal review

Ready whenYour team checks the buyer portal and makes the final submission decision.
Decision states

Use states that say what happens next.

HOLDDo not release

A significant condition remains unresolved. Record what must happen before release.

REVIEWDecision needed

The information is available for review, but approval is still pending.

READYProceed to human release

The current bid version has passed the defined checks. Your team still controls submission.

Release conditions

Ready means the release conditions are satisfied.

Use these checks with the buyer’s instructions and your own approval policy. They are team controls, not claims that REQVERA automates every step.

01

Authority and coverage

Proposal ownerConfirm the current tender documents and amendments. Match each mandatory requirement to its answer and track outstanding clarifications. A missing mandatory item remains a blocker.
02

Proof and approvals

Evidence and decision ownersCheck claim wording against current applicable evidence. Resolve conflicting or expired proof. Record the person authorised to approve exceptions and the version their decision covers.
03

Commercial offer and signatures

Authorised commercial reviewerCheck the pricing workbook, totals, assumptions, validity period and contractual qualifications against approved terms. Confirm the required signatures and signing authority. A finished narrative does not constitute commercial approval.
04

Forms and attachments

Package ownerVerify every required form, attachment, filename, file type, size limit and packaging instruction. Open the exported files to confirm legibility, populated fields and the approved versions.
05

Deadline and portal

Authorised submitterConfirm the deadline and timezone from the current buyer source, required portal access and any upload or validation steps. Leave time for failed uploads and corrections. A local readiness decision does not mean the portal has accepted the bid.
06

Exact candidate and receipt

Release ownerIdentify the final files and retain the approval record. Recheck affected controls after any significant change. After your team submits the bid, keep the buyer confirmation and match it to the uploaded files.
Decision example

One unsupported claim. One clear next action.

A synthetic bid promises a 40% reduction in missed appointments. The evidence supports 18% for one clinic—not the submitted claim. Follow the correction before the package goes to the buyer.

Current buyer instruction B-017 v2 requires a documented result and its limits. Check the wording against the current instruction, not a reused answer. B-017 v2 remains the review baseline.

Claim and supporting proof Candidate A states 40%; E-017 v1 records 18% in one clinic. The evidence owner narrows the claim to the recorded result and scope. Candidate B states 18%, the clinic, the period and the limits.

Approval after correction Candidate A stays on HOLD; changing a sentence is not a new clearance. The authorised reviewer checks the revised claim and its evidence again. Record the decision for Candidate B; keep HOLD if a critical condition remains.

The files that will leave A new export can differ from the version reviewed. Match the final file inventory to the reviewed version before sign-off. CLEAR is conditional on all defined checks passing; portal review and submission remain human steps.

Illustrated team-control example, not a customer result or an executed REQVERA import test. The figures and documents are synthetic. Approval must be observed and recorded; this example does not prove product clearance or buyer acceptance.

Use the seven-stage release checklist to record the evidence behind each decision. If buyer authority changes, follow the amendment impact chain before carrying an earlier approval forward.

Release boundary

“Draft complete” is an input to readiness, not the readiness decision.

Completing the writing work does not automatically validate the evidence, amendment state or final file set.

NextUse the release checklist to walk the seven control questions in order.
Explore by need

Keep the next control question clear.

Choose the resource that answers your next review question, whether it concerns requirements, evidence or the final files.